Pit-Less

We manufacture pit-less weigh bridges as per space availability at site. While pit-less mode having the benefits of less civil work, easy maintenance & no water logging problems.

Pit Less type
Pit less type weighbridge / Truck scale is most suitable where the excavation work for foundation is difficult or construction of pit is expensive. Since the structure is above ground level, vehicles can approach the weighbridge only from two directions where the ramps are provided. This type of weighbridge requires more space.

But the Benefits of pit less weigh bridges are.
Costly Pit construction is eliminated.
Platform above ground level- No water logging during rainy season
Problem of pit maintenance is eliminated.
Easy maintenance since all parts accessible above ground level.

Note : In Pit less weighbridge RCC ramp work must be required at least 3 meters for both side for easy movement of vehicle.

Pit-Less type of weigh bridge are of two type
1. Steel weigh bridge
2. Concrete weigh bridge

Steel Weigh Bridge

pitless steel weigh bridge
• Light in weight so it’s easier to transpose.
• Old conventional system, there for customer has more reliability factor than concrete Weighbridge.
• Resale value of steel is much higher than concrete weighbridge.
• Faster and easier to install.

 

Concrete Weigh Bridge

• Accuracy in R.C.C weighbridge is much higher because no binding as platform in steel Weigh Bridges.
• Price is Almost 40% less as compared to steel Weighbridge.
• Vehicle movement is controlled by the rough surface.
• No mechanical components are used so no wear and tear.